The quote that met the budget and deadline.
The comparison preserved the full price, deadline and remaining conditions.
This is an actual completed run through the lab’s existing private Archon Control task workflow. Explore its saved record below. These controls change what you see; they do not start or repeat model work.
Full recorded transcript. All sections are available without JavaScript.
The request
Compare these two sample print quotes for 200 workshop handouts. Show the full cost, delivery tradeoff and what still needs confirming. Give me a concise recommendation that follows the stated deadline and budget.
Sample print quotes
Sample request: 200 A5 double-sided colour handouts needed by 18 November 2026; maximum all-in budget $100. North Print quote: $0.32 per handout, setup $12, delivery $10, tax 8% on printing plus setup only, promised arrival 17 November. River Press quote: $0.28 per handout, setup $20, pickup free, tax 8% on printing plus setup, ready for pickup 19 November. River offers rush service at $15 before tax, with pickup 17 November. Neither quote confirms whether a proof is included. User has transport for pickup.
The actual result
The run produced a readable quote comparison and matching structured JSON. The content below renders the original Markdown output; original file bytes are retained for download.
Sample print quote comparison
Sample data for a public demonstration. Requirement: 200 A5 double-sided colour handouts by 18 November 2026; maximum all-in budget $100.
Recommend North Print: $92.08 delivered on 17 November as quoted, $6.20 less than River rush, with $7.92 left under the $100 maximum. River rush at $98.28 is a qualifying pickup alternative with $1.72 remaining; transport is available. River standard is cheapest at $82.08 but pickup on 19 November misses the 18 November deadline.
| Option | Quoted total | Quoted fulfilment | Meets deadline? | Within $100? | Qualifies as quoted? |
|---|---|---|---|---|---|
| North Print | $92.08 | Delivery 17 November 2026 | Yes | Yes | Yes |
| River standard | $82.08 | Free pickup 19 November 2026 | No | Yes | No |
| River rush | $98.28 | Free pickup 17 November 2026 | Yes | Yes | Yes |
Full cost and tax basis
Tax is 8% on printing plus setup. North delivery is excluded from tax; River’s $15 rush surcharge is taxable. Pickup is free.
- North Print: 200 × $0.32 = $64.00 printing; $64.00 + $12.00 setup + $0.00 rush = $76.00 taxable; $76.00 × 8% = $6.08 tax; $76.00 + $6.08 + $10.00 delivery = $92.08.
- River standard: 200 × $0.28 = $56.00 printing; $56.00 + $20.00 setup + $0.00 rush = $76.00 taxable; $76.00 × 8% = $6.08 tax; $76.00 + $6.08 + $0.00 delivery = $82.08.
- River rush: 200 × $0.28 = $56.00 printing; $56.00 + $20.00 setup + $15.00 rush = $91.00 taxable; $91.00 × 8% = $7.28 tax; $91.00 + $7.28 + $0.00 delivery = $98.28.
What still needs confirming
- Proof inclusion is unconfirmed for both suppliers. Confirm whether a proof is included and any additional charge, including tax; extra costs could change budget qualification.
- Confirm the quoted 17 November fulfilment commitment for the selected option. Dates here are quoted commitments, not independently verified availability guarantees.
What the review checked
All four independent criteria passed. The coordinator’s final verdict and artifact gate also passed for this task.
- Criterion 1: passed. Independently recomputed totals: North ($64+$12)×1.08+$10=$92.08; River standard ($56+$20)×1.08=$82.08; River rush ($56+$20+$15)×1.08=$98.28. Both artifacts show arithmetic and tax bases, excluding North delivery and including River rush surcharge.
- Criterion 2: passed. Both artifacts identify River standard's 19 November pickup as missing the 18 November 2026 deadline. North delivery and River rush pickup are quoted for 17 November and correctly qualify under $100.
- Criterion 3: passed. Both recommend North at $92.08 delivered, saving $6.20 against River rush. River rush remains a qualifying $98.28 pickup alternative; available transport is supported by the sample input.
- Criterion 4: passed. Both explicitly mark proof inclusion as unconfirmed; JSON uses null for all options. No invented quality ratings, availability guarantees, personal details or purchase actions appear. Both label the data as sample material. JSON parses successfully; calculations, recommendation and confirmation text match Markdown. Source and artifact SHA-256 hashes match the supplied pins.
Read the coordinator’s verdict
Artifact and gate evidence hashes match. Independent grade passes all four criteria; gate reports complete with no failures. Rechecked totals, tax bases, deadline and budget qualification, and Markdown/JSON agreement. North is the lowest-cost qualifying option; River rush remains an alternative. Proof inclusion remains unconfirmed. No final effect executed.
Inspect the completed stages and build
- Discovery source: completed
- Discovery constraints: completed
- Synthesis: completed
- Implementation: completed
- Verification: completed
- Coordinator review: completed
Started: 2026-11-02T05:47:08.459104+00:00
Completed: 2026-11-02T06:04:51.200371+00:00
See the retained task in Archon Control

A retained record of the completed work
This example retains its original input, output files and reviewed work record. No interruption or recovery test is claimed for this run.
What this example does not do
- All suppliers, prices and event details are sample inputs. No order or purchase was made.
- This public record omits private operational paths, credentials and conversations.
Recorded demonstration and downloadable result; this page does not submit a new model task.